MLA/2013/00335 Application Wave Hub Limited Renewables Western Submitted 21-AUG-2013

Via https://marinelicensing.marinemanagement.org.uk/mmo/fox?thread_id=e2gvum...

Title of ProjectFloating Offshore Wind Platform Demonstrator at Wave Hub in Cornwall
Background to Project (aims and objectives)The Energy Technologies Institute (ETI) has selected The Glosten Associates as its partner to design a floating platform system demonstrator integrated with an existing full scale, state of the art wind turbine. The aim of this project is to accelerate the market introduction of floating foundations for offshore wind turbines so that they can be quickly deployed in areas that are unsuitable for conventional offshore wind farms, potentially opening up new areas and dramatically cutting the cost of offshore wind energy technology. The ETI and Glosten Associates are looking to demonstrate the floating platform for up to ten years at the Wave Hub deployment site.
Wave Hub Limited is therefore proposing to broaden the existing use of Wave Hub to include offshore wind and to secure consent to deploy a single floating platform with a wind turbine in one berth of the deployment site. The demonstration project would connect into the existing subsea infrastructure and the electricity generated would be distributed via the Wave Hub substation into the local grid network.
The proposed deployment and operation of a floating offshore wind platform within the Wave Hub deployment site would operate in parallel with wave energy devices deployed on the site in the remaining three berths.
Programme of Works (stages and timings)Project components are expected to be fabricated by late spring 2015. The steel platform will be fabricated in a dry dock and the turbine components will be installed on the quayside. The two major elements of the platform and turbine will then be brought together at the quayside. This is expected to take place in Belfast, Northern Ireland.
The anchors, dynamic electricity export cable, and the turbine/platform assembly are expected to be installed during summer 2015. The turbine is expected to be operational by December 2015.
The turbine is expected to operate for up to 10 years at Wave Hub with generated power exported to Western Power Distribution's local distribution network via the Wave Hub onshore substation at Hayle. Measurement and monitoring of system performance will be conducted throughout its deployment.

 

Related Consents/Applications


Are there any previous Marine Management Organisation consents or applications relating to this application
Yes
*Type*Reference 
Consent/Licence
Marine Licence No L/2013/00163 
Consent/Licence
FEPA Licence No 33383/07/0 
Consent/Licence
FEPA Licence 34827/10/0

Project Details

Proposed Start Date01-APR-2015 Proposed End Date31-DEC-2025
Cost of whole project seaward of MHWS (£)0

 

Document TypeUploaded ByFile (Size)Actions
 Public Register Document
Craig Loughlin
21 AUG 2013 09:42
05-3256-00-U-0-004 Rev 05 AS BUILT - OFFSHORE DEPLOYMENT AREA.pdf(190.26 KB)
Site plan showing deployment area.
 
      
 
 Public Register Document
Craig Loughlin
22 AUG 2013 16:58
12151.05-820-01_P1_Sheet 6 - Fig 6.pdf(552.06 KB)
Figure 6
 
      
 
 Public Register Document
Craig Loughlin
21 AUG 2013 11:11
Figure10__ Viewpoints.pdf(4.3 MB)
Viewpoints St Ives and Navax Point
 
      
 
 Public Register Document
Craig Loughlin
22 AUG 2013 16:57
12151.05-001-01-P6_Sheet 1 - Fig 4.pdf(214.23 KB)
Figure 4
 
      
 
 Public Register Document
Craig Loughlin
22 AUG 2013 16:59
12151.05-820-01_P1_Sheet 13 - Fig 7.pdf(323.99 KB)
Figure 7
 
      
 
 Public Register Document
Craig Loughlin
22 AUG 2013 16:53
WH s36 - ML final1.pdf(5.38 MB)
Application report for Wave Hub
 
      
 
 Public Register Document
Craig Loughlin
22 AUG 2013 17:06
Draft HRA Screening Report rev8_updated220813.pdf(902.44 KB)
Draft HRA
 
      
 
 Public Register Document
Craig Loughlin
21 AUG 2013 11:08
Wave_Hub_ZTV 2013.pdf(1.23 MB)
Zone of Theoretical Visibility 2013
 
      
 
 Public Register Document
Craig Loughlin
22 AUG 2013 16:58
12151.05-700-01-P1_Sheet 1 - Fig 5.pdf(220.29 KB)
Figure 5
 
      
 
 Public Register Document
Frances Burrows
23 SEP 2013 13:52
Appendix C Collision Risk Spreadsheet_Wavehub.xlsm(106.1 KB)
 
 
      
 
 Public Register Document
Frances Burrows
23 SEP 2013 13:53
Draft HRA Screening Report rev8_updated120913_DGW_LB.docx(1.35 MB)
 
 
      
 
 Public Register Document
Frances Burrows
23 SEP 2013 13:53
Appendix D gull survey data.xlsx(14.63 KB)

 

Wavehub Deployment Area

Book page

TitleCreated
240310 | Detailed plans for affordable-led housing in Connor Downs 10th March 1 week 19 hours agoBook page
240310 | Waste collections changes Helston, Penzance, Hayle | second phase:food waste, recycling, rubbish - commences July 1 week 20 hours agoBook page
240218 | Collapsed North Quay development in Hayle described as a 'sea of despair' 3 weeks 5 days agoBook page
240214 | Hayle North Quay development collapse sees eight companies go bust Work has ground to a halt on the blocks of flats 4 weeks 20 hours agoBook page
240220 | Poling works | Grist Lane and Marsh Lane, Angarrack | expected 20 Feb 2024 0830-1630, for one day 5 weeks 6 days agoBook page
231130 | Are you ready for weekly food waste recycling? | Food Waste, Recycling and Rubbish Collection Changes 14 weeks 4 days agoBook page
230821 | People of Cornwall town 'thrown under bus' over housing plan | direct result of councillors handled Hayle masterplan 29 weeks 5 days agoBook page
230817 | When will new rubbish collection changes start, Cornwall 30 weeks 4 days agoBook page
230809 | Holiday park in Cornwall for emergency housing still empty | Sandbank site purchased Cornwall Council in Jan 2022 31 weeks 2 days agoBook page
230811 | Decision on huge solar farm at Carnhell Green: refused 31 weeks 2 days agoBook page
230809 | Nearest NHS dental practice to Cornwall taking new patients 31 weeks 2 days agoBook page
230730 | Practice Comparison: Praze-An-Beeble Surgery; Bodriggy Health Centre | 2023 GP Patient Survey 33 weeks 23 hours agoBook page

tags in