Christmas Lights

Village News

Friday 1 July - 5pm 12 August 2016 | Public Consultation on Schedule of Post Hearing Changes to the Draft Cornwall Local Plan

**Public Consultation on Schedule of Post Hearing Changes to the Draft Local Plan. Following the examination in May 2016 a number of proposed changes have been made to the document. Please let us know what you think about the Schedule of Post Hearing Changes. The Consultation begins on Friday 1st of July and will end at 5pm on the 12th August 2016.**

via http://www.cornwall.gov.uk/environment-and-planning/planning/planning-po...

Public Consultation on Post Hearing Changes to the Draft Local Plan

1 July to 5pm on 12 August 2016

The Cornwall Local Plan – Strategic Policies proposed submission document incorporating the Schedule of Focussed Changes sets out the main planning policies for Cornwall up to 2030.

Following the second hearings of the examination in May 2016 a number of changes are proposed to the document. These changes are contained in a Schedule of Post-Hearing Changes which includes changes previously consulted upon in January 2016.

Please let us know what you think about the Schedule of Post Hearing Changes using the response form.

At this time we are only consulting on the most recent changes and not the submitted Cornwall Local Plan – Strategic Policies this was done earlier in March 2014 and September 2014. Neither are we consulting on the changes consulted upon in January 2016. These are shown in the Schedule as previously explained, but have been greyed out as they are not subject of this consultation.

It is important that comments are only about, and make clear reference to, the specific proposed change highlighted in the schedule and expressed in the form of double strike through for deletions and bold text and double underlining for additions to text The Inspector will only consider comments on the new changes. This consultation is not an opportunity to comment on other parts of the Plan or on the changes previously published as emphasised above.

Key documents are listed below (the Supporting List of Documents provides the full list of evidence):

All comments made will be submitted to the Inspector.

 

Paragraph 1.24 dispersed approach to development is more constra

7 - 13 1.24 Move paragraph 1.24 to before paragraph 1.28 and amend to read: Underpinning all this is the need to protect the quality and natural beauty, including the landscape, ecology and historic character of our environment, for its own sake but also as an economic driver and to build and maintain resilience to climate change. To achieve this will require a positive approach to managing new development. In some cases , adaptations to accommodate the likely impacts of climate change will be required to allow for de velopment to proceed. Cornwall’s unique character is reflected in a range of designations from its cultural history in terms of World heritage status, the importance of its biodiversity in European and Nationally designated areas of biodiversity through to the quality of its landscape with over 30% of the landscape designated as Areas of Outstanding Natural Beauty (AONB), quality of the environment is not limited to those areas recognised by National designation but the plan strategy does need to reflect the particular importance attached to designated landscapes in its strategy. For that reason the dispersed approach to development is more constrained in those areas where designated landscapes or biodiversity assets limit capacity or the speed of future growth

Believe that the latest

Believe that the latest online changes are in https://www.cornwall.gov.uk/media/17155253/local-plan-combined-version-j... to be compared with http://www.cornwall.gov.uk/media/20384097/nsc61-schedule-of-post-hearing... but might be worth checking for yourselves!

Comment viewing options

Select your preferred way to display the comments and click "Save settings" to activate your changes.

Book page

TitleCreated
180701 | Gwinear-Gwithian and Hayle East to replace Hayle South | Boundary Review Update | Local Government Boundary Commission 12 hours 34 min agoBook page
W1/09-0173 | Retention of dwelling & construction of additional dwelling Head No(s): 87336 | Adj To Railway Viaduct Riverside La 4 days 6 hours agoBook page
180320 | Approved Hayle South Quay plans include homes, restaurant and retail units and footbridge to town - Cornwall Live 2 weeks 10 hours agoBook page
180323 | FCBS finally wins go-ahead for revised Cornish quay proposals | News | Architects Journal 2 weeks 10 hours agoBook page
180613 | PA18/01645/PREAPP | Historic Building pre-application advice for proposed residential development of approximately 9 ap 2 weeks 13 hours agoBook page
Approved with conditions | PA18/04517 | Construction of extension and entrance porch to existing dwelling - 13 13A Steamers Hill 2 weeks 14 hours agoBook page
1895 | TO LET, with early possession, the "ANGARRACK INN" | Apply Ellis and Son, The Brewery 2 weeks 1 day agoBook page
1948 | Angarrack Puts Out Its Flags Angarrack was en fete on Saturday for the winding up of its gala festival 2 weeks 1 day agoBook page
1917 | FIRE AT ANGARRACK. SHOP BURNT OUT 2 weeks 1 day agoBook page
1934 | A PEACEFUL (ANGARRACK) VALLEY - opportunity of purchasing copies of an artist s proof edition 2 weeks 1 day agoBook page
1948 | Anganack Methodist Church was re-opened last week, after renovation 2 weeks 1 day agoBook page
1926 | The drab surroundings of much of the village life at this season of the year were relieved last Thursday by a tea and ent 2 weeks 1 day agoBook page

tags for Friday 1 July - 5pm 12 August 2016 | Public Consultation on Schedule of Post Hearing Changes to the Draft Cornwall Local Plan