210805 | Flooding report Riverside - EDS 2021 | Updated | via PA21/02265

J-1760 Flood Risk Assessment – New Dwelling 13 Riverside Angarrack

Engineering and Development Solutions Ltd

Flooding report Riverside - EDS 2021

An assessment was made of the Angarrack Stream culvert capacity based on its dimensions and gradient when considering likely inlet and outlet levels from LiDAR data. The capacity was determined to be approximately 9m3/s. When considering larger order fluvial events, particularly those above the 1 in 100 year storm for the Angarrack Stream, the culvert capacity is likely to be overwhelmed. The peak flows detailed in Table 1 indicate the Angarrack Stream flows, calculated using the FEH catchment descriptors method, and give a peak flow of 11.29m3/s. This flow rate is approximately 25% higher than the capacity of the culvert. This will result in accumulation of flows at the culvert inlet headwall and overland flows towards the north and past the subject site. As such, a number of scenarios were considered in the modelling taking into account possible high flows or the culvert blocking.


Selected extracts

Rear of the existing garage location, where the ground level is lowest at 15.45m AOD

The finished flood level (FFL) for the living and sleeping accommodation will be set at a minimum level of 16.37m AOD. This is 600mm above the level of the 1 in 100 year flood event plus a 40% allowance for climate change (15.77m + 0.6m).


The access/egress route for the proposed development is off Riverside, the highway passing the front of the site. This is inundated with flood waters during all events modelled. The flood depths range from 0.18 to 0.46m with flow velocities no grater than 1.51m/s. These conditions result in ‘Danger for Most’ according to the DEFRA document FD2320/TR2 “Flood Risk Assessment Guidance for New Development”.

The nearest access to higher ground from the site is via a Public Footpath located approximately 55m to the north west along Riverside towards the Railway viaduct. It is recommended residents of the proposed development should evacuate at the earliest signs of a possible flood event occurring and well in advance of any flood taking place if safe to do so using the route demonstrated in Figure 11. If it is not safe to evacuate the property, as the living area is proposed to be located on the 1st floor, residents could safely remain on site during periods of flooding at the site during the flood events considered within this report.


An assessment was made of the Angarrack Stream culvert capacity based on its dimensions
and gradient when considering likely inlet and outlet levels from LiDAR data. The capacity was
determined to be approximately 9m3/s. When considering larger order fluvial events, particularly
those above the 1 in 100 year storm for the Angarrack Stream, the culvert capacity is likely to
be overwhelmed. The peak flows detailed in Table 1 indicate the Angarrack Stream flows,
calculated using the FEH catchment descriptors method, and give a peak flow of 11.29m3/s.
This flow rate is approximately 25% higher than the capacity of the culvert. This will result in
accumulation of flows at the culvert inlet headwall and overland flows towards the north and
past the subject site. As such, a number of scenarios were considered in the modelling taking
into account possible high flows or the culvert blocking.

 

 

 

https://planning.cornwall.gov.uk/online-applications/files/CF26844A40975...

Mitigation Measures
Access and Egress - Riverside
Fluvial Flood Extents
Fluvial Flood Extents plus 50%
Schematic overview of the model including a background LiDAR terrain model.
Catchments

Book page

TitleCreated
240410 | Coroner to write to health secretary about ambulance delays prior to two deaths | called for improvements in response 2 days 3 hours agoBook page
240417 | Health campaigners fighting to see the return of 24-hour urgent care in West Cornwall say they now fear it may not happ 2 days 4 hours agoBook page
230417 | Hayle North Quay collapsed company Sennybridge leaves £135 million debts 3 days 17 hours agoBook page
240325 | Open letter to all party candidates | sign to help Cornwall Wildlife Trust make difference for Nature at election 3 weeks 1 day agoBook page
240310 | Detailed plans for affordable-led housing in Connor Downs 10th March 5 weeks 4 days agoBook page
240310 | Waste collections changes Helston, Penzance, Hayle | second phase:food waste, recycling, rubbish - commences July 5 weeks 4 days agoBook page
240224 | Doomed Hayle North Quay development through the years - in pictures 7 weeks 6 days agoBook page
240218 | Collapsed North Quay development in Hayle described as a 'sea of despair' 8 weeks 1 day agoBook page
240214 | Hayle North Quay development collapse sees eight companies go bust Work has ground to a halt on the blocks of flats 8 weeks 4 days agoBook page
240220 | Poling works | Grist Lane and Marsh Lane, Angarrack | expected 20 Feb 2024 0830-1630, for one day 10 weeks 2 days agoBook page
231130 | Are you ready for weekly food waste recycling? | Food Waste, Recycling and Rubbish Collection Changes 19 weeks 1 day agoBook page
230821 | People of Cornwall town 'thrown under bus' over housing plan | direct result of councillors handled Hayle masterplan 34 weeks 2 days agoBook page