Christmas Lights

Village News

Hayle

181105 | PA18/10457 | Construction of 24 new dwellings, internal shared surface access road of existing traffic signalled juncti

PA18/10457 | Construction of 24 new dwellings, internal shared surface access road of existing traffic signalled junction and associated parking and infrastructure - Foundry Yard Carnsew Road Hayle
Proposed location of the Goonvean engine (outlined in red) 06/07/2015

Construction of 24 new dwellings, internal shared surface access road of existing traffic signalled junction and associated parking and infrastructure - Foundry Yard Carnsew Road Hayle

Ref. No: PA18/10457 | Received date: Mon 05 Nov 2018 | Status: Pending Consideration | Case Type: Planning Application

4.34.  The site retains the potential to be developed under the 2012 retail permission
.
 read more »

181101 | North Quay walls, steps, former stables and sluice and adjacent road bridge, Hayle - 1455446 | Historic England

North Quay walls, steps, former stables and sluice and adjacent road bridge, Hayle - 1455446 | Historic England

North Quay walls, steps, former stables and sluice and adjacent road bridge

Overview

Heritage Category: Listed Building

Grade: II

List Entry Number: 1455446  read more »

181025 | Hayle Fights “Completely Unacceptable” Harbour Development | Hayle Town Council

Hayle Fights “Completely Unacceptable” Harbour Development

The Mayor of Hayle, Clive Polkinghorne, says residents of Hayle must give their views on a proposed new development on North Quay, which he believes is “completely unacceptable” to the town.

At a meeting of Hayle Town Council on October 18 it was unanimously agreed to “strongly oppose” a development of buildings on the harbour front which could be several storeys high on the grounds of its visual impact, lack of protection of heritage, and multiple breaches of the town’s Neighbourhood Plan on parking, scale and type of development, traffic, heritage and the need to maintain the identity of different parts of the town.  read more »

181015 | Serious RTC - A30 Hayle bypass Cornwall | This information has been sent on behalf of Devon and Cornwall Police

Information sent on behalf of Devon and Cornwall Police
Serious RTC - A30 Hayle bypass Cornwall

At about 10.50am on Sunday 14 October 2018 a three vehicle collision occurred on the A30 Hayle Bypass between St Erth and Loggans Moor Roundabout.  read more »

181001 | Copperhouse gate refurbishment

Copperhouse gate refurbishment will ensure Hayle continues to be protected from flooding

This autumn the Environment Agency will carry out refurbishment work on the Copperhouse Gate.

The gate is a critical part of the Angarrack Flood Alleviation Scheme which provides flood protection to 138 properties in the Copperhouse area of Hayle. The refurbishment will ensure that the existing level of flood defence is maintained for a further 30 years.

Work will be carried out by Environment Agency contractors BMMJV and will begin this November. Refurbishment of the gate will take approximately 7 weeks and during this time an area of the North Quay will not be accessible to the public.  read more »

What's On Oct/Nov 2018 | hayle Pump

Updated 9 October 2018 (listings from Issue #141: October/November 2018  read more »

180726 | Planning application PA18/05586 "refurbishment and conversion of Loggans Mill building into 16 apartments"

26/07/2018. Planning application PA18/05586 has been submitted for:

"The refurbishment and conversion of Loggans Mill building into 16 apartments, including internal and external alterations with associated parking."

http://planning.cornwall.gov.uk/online-applications/applicationDetails.do?activeTab=documents&keyVal=PABF1SFGHLJ00  read more »

Syndicate content