Christmas Lights

Village News

Friday 1 July - 5pm 12 August 2016 | Public Consultation on Schedule of Post Hearing Changes to the Draft Cornwall Local Plan

**Public Consultation on Schedule of Post Hearing Changes to the Draft Local Plan. Following the examination in May 2016 a number of proposed changes have been made to the document. Please let us know what you think about the Schedule of Post Hearing Changes. The Consultation begins on Friday 1st of July and will end at 5pm on the 12th August 2016.**

via http://www.cornwall.gov.uk/environment-and-planning/planning/planning-po...

Public Consultation on Post Hearing Changes to the Draft Local Plan

1 July to 5pm on 12 August 2016

The Cornwall Local Plan – Strategic Policies proposed submission document incorporating the Schedule of Focussed Changes sets out the main planning policies for Cornwall up to 2030.

Following the second hearings of the examination in May 2016 a number of changes are proposed to the document. These changes are contained in a Schedule of Post-Hearing Changes which includes changes previously consulted upon in January 2016.

Please let us know what you think about the Schedule of Post Hearing Changes using the response form.

At this time we are only consulting on the most recent changes and not the submitted Cornwall Local Plan – Strategic Policies this was done earlier in March 2014 and September 2014. Neither are we consulting on the changes consulted upon in January 2016. These are shown in the Schedule as previously explained, but have been greyed out as they are not subject of this consultation.

It is important that comments are only about, and make clear reference to, the specific proposed change highlighted in the schedule and expressed in the form of double strike through for deletions and bold text and double underlining for additions to text The Inspector will only consider comments on the new changes. This consultation is not an opportunity to comment on other parts of the Plan or on the changes previously published as emphasised above.

Key documents are listed below (the Supporting List of Documents provides the full list of evidence):

All comments made will be submitted to the Inspector.

 

Paragraph 1.24 dispersed approach to development is more constra

7 - 13 1.24 Move paragraph 1.24 to before paragraph 1.28 and amend to read: Underpinning all this is the need to protect the quality and natural beauty, including the landscape, ecology and historic character of our environment, for its own sake but also as an economic driver and to build and maintain resilience to climate change. To achieve this will require a positive approach to managing new development. In some cases , adaptations to accommodate the likely impacts of climate change will be required to allow for de velopment to proceed. Cornwall’s unique character is reflected in a range of designations from its cultural history in terms of World heritage status, the importance of its biodiversity in European and Nationally designated areas of biodiversity through to the quality of its landscape with over 30% of the landscape designated as Areas of Outstanding Natural Beauty (AONB), quality of the environment is not limited to those areas recognised by National designation but the plan strategy does need to reflect the particular importance attached to designated landscapes in its strategy. For that reason the dispersed approach to development is more constrained in those areas where designated landscapes or biodiversity assets limit capacity or the speed of future growth

Believe that the latest

Believe that the latest online changes are in https://www.cornwall.gov.uk/media/17155253/local-plan-combined-version-j... to be compared with http://www.cornwall.gov.uk/media/20384097/nsc61-schedule-of-post-hearing... but might be worth checking for yourselves!

Comment viewing options

Select your preferred way to display the comments and click "Save settings" to activate your changes.

Book page

TitleCreated
170719 | PA17/06782 | Erection of a new dwelling and detached garage. - Land NW Of 5 Grist Lane Angarrack Cornwall 5 days 6 min agoBook page
170807 | St Erth roundabout A30 section to be restricted to 30mph limit for eight months | Cornwall Live 1 week 2 days agoBook page
170622 | Grigg’s Quay, Lelant – LATEST | Hayle development discussion group FB 1 week 5 days agoBook page
170726 | Tools from Cornwall’s first farmers among important archaeological finds at Hayle construction site (From Falmouth Pack 1 week 5 days agoBook page
170725 | Dave on Twitter: "Crazy that the biggest ship built in #cornwall #SSRamleh at 3,800 tonnes was built in #hayle in 1890 2 weeks 5 days agoBook page
170711 | Sluicing Timetable 2017 (Sirens Sound on Release) 5 weeks 5 days agoBook page
170708 | Land Rover emerges from sand at Gwithian beach after getting stuck almost 30 years ago | Cornwall Live 5 weeks 5 days agoBook page
170708 | Armourer Terry English and photographer John Mason make calendar with women as historical figures | Cornwall Live 5 weeks 5 days agoBook page
Salty Songs on Twitter: "Got to love a good Cornish tradition... Lovely weather for the annual Angarrack Duck Race 5 weeks 6 days agoBook page
080720 | W1/08-1024 | Construction of replacement dwelling Head No(s): 61815 | 10 Riverside Angarrack 10 weeks 6 days agoBook page
PA17/04181 | Application for the approval of Reserved Matters pursuant to hybrid permission PA12/10064 for 27 residential units 12 weeks 2 days agoBook page
PA17/04948 | Submission of details to discharge condition 6 in respect of Decision Notice PA17/00288 dated 9th March 2017 - 12 B 12 weeks 3 days agoBook page

tags for Friday 1 July - 5pm 12 August 2016 | Public Consultation on Schedule of Post Hearing Changes to the Draft Cornwall Local Plan