J-1760 Flood Risk Assessment – New Dwelling 13 Riverside Angarrack

Engineering and Development Solutions Ltd

Flooding report Riverside - EDS 2021

An assessment was made of the Angarrack Stream culvert capacity based on its dimensions and gradient when considering likely inlet and outlet levels from LiDAR data. The capacity was determined to be approximately 9m3/s. When considering larger order fluvial events, particularly those above the 1 in 100 year storm for the Angarrack Stream, the culvert capacity is likely to be overwhelmed. The peak flows detailed in Table 1 indicate the Angarrack Stream flows, calculated using the FEH catchment descriptors method, and give a peak flow of 11.29m3/s. This flow rate is approximately 25% higher than the capacity of the culvert. This will result in accumulation of flows at the culvert inlet headwall and overland flows towards the north and past the subject site. As such, a number of scenarios were considered in the modelling taking into account possible high flows or the culvert blocking.


Selected extracts

Rear of the existing garage location, where the ground level is lowest at 15.45m AOD

The finished flood level (FFL) for the living and sleeping accommodation will be set at a minimum level of 16.37m AOD. This is 600mm above the level of the 1 in 100 year flood event plus a 40% allowance for climate change (15.77m + 0.6m).


The access/egress route for the proposed development is off Riverside, the highway passing the front of the site. This is inundated with flood waters during all events modelled. The flood depths range from 0.18 to 0.46m with flow velocities no grater than 1.51m/s. These conditions result in ‘Danger for Most’ according to the DEFRA document FD2320/TR2 “Flood Risk Assessment Guidance for New Development”.

The nearest access to higher ground from the site is via a Public Footpath located approximately 55m to the north west along Riverside towards the Railway viaduct. It is recommended residents of the proposed development should evacuate at the earliest signs of a possible flood event occurring and well in advance of any flood taking place if safe to do so using the route demonstrated in Figure 11. If it is not safe to evacuate the property, as the living area is proposed to be located on the 1st floor, residents could safely remain on site during periods of flooding at the site during the flood events considered within this report.


An assessment was made of the Angarrack Stream culvert capacity based on its dimensions
and gradient when considering likely inlet and outlet levels from LiDAR data. The capacity was
determined to be approximately 9m3/s. When considering larger order fluvial events, particularly
those above the 1 in 100 year storm for the Angarrack Stream, the culvert capacity is likely to
be overwhelmed. The peak flows detailed in Table 1 indicate the Angarrack Stream flows,
calculated using the FEH catchment descriptors method, and give a peak flow of 11.29m3/s.
This flow rate is approximately 25% higher than the capacity of the culvert. This will result in
accumulation of flows at the culvert inlet headwall and overland flows towards the north and
past the subject site. As such, a number of scenarios were considered in the modelling taking
into account possible high flows or the culvert blocking.

 

 

 

https://planning.cornwall.gov.uk/online-applications/files/CF26844A40975...

Mitigation Measures
Access and Egress - Riverside
Fluvial Flood Extents
Fluvial Flood Extents plus 50%
Schematic overview of the model including a background LiDAR terrain model.
Catchments

Book page

TitleCreated
2026-April-POSTPONED-planned improvements i.e. install footpath, paint double yellow lines junction Grist Lane Hatchs Hill 3 days 3 hours agoBook page
2026 - Resurfacing Steamers Hill; Hatchs Hill; Angarrack Lane | 1 Apr 07:30 - 17 Apr 23:59 2 weeks 22 hours agoBook page
250330; Closure order:30 Mar-17 Apr 2026; 07:30-17:00; Clearway Parking Zone; Hatchs Hill, Steamers Hill and Angarrack Lane 3 weeks 2 days agoBook page
Traffic/Roads - Marsh/Grist Lane - Traffic counts 2019 onwards 14 weeks 6 days agoBook page
Approved with conditions | PA25/07094 | First floor extension over existing garage to create Art studio with guest bedroom... 19 weeks 2 days agoBook page
PA25/07094 | First floor extension over existing garage to create Art studio with guest bedroom, covered parking area below | As 20 weeks 1 day agoBook page
251027 | 20mph Monitoring—Hayle & St Ives Speed Data; Phase 3a-May-Jun 24 v Sep-Oct 24; Steamers Hill; Gwinear;Carbis;Nancledra 24 weeks 1 day agoBook page
PA25/07184 | Retention of 4no. existing holiday pods, swimming pool, incidental building, extended driveway and annexe converted 24 weeks 4 days agoBook page
251009 | Stark reality of life in Cornwall revealed through 2025 Vital Signs Report 26 weeks 5 days agoBook page
251010 | Cornwall backs 20mph rollout; St Austell's the only town to reject the plans 26 weeks 5 days agoBook page
250930 | Cornwall’s 20 mph speed limits have made the roads much safer 28 weeks 1 day agoBook page
250905 - POSTPONED: Proposed resurfacing of Steamers Hill/Hatch's Hill that was due to happen end of July beginning of August 31 weeks 9 hours agoBook page